Featured

Explore 5th Axis RockLock™ Tombstones

• Modular, fast-change tombstone systems for horizontal machining centers

CALCULATE YOUR RETURN

MEASURE YOUR MACHINE TIME POTENTIAL.

Quantify the exact financial impact of upgrading to 5th Axis zero-point workholding and automation. Built with real shop math, not marketing fluff.

Hero Contact
5th Axis — Machine Time ROI Report
✓ Shop
✓ Setup
✓ Machine
✓ Automation
✓ Quality
STEP 1 OUT OF 5

Your shop Profile.

Set your baseline operating costs. These numbers drive every calculation below.

4
2
$
$
250
How is this Used

Labor and machine rates combine to give your true "loaded" cost per non-cutting minute. Every minute your spindle isn't turning costs you both.

STEP 2 OUT OF 5

Setup time Savings.

Zero-point workholding eliminates re-locating, re-indicating, and re-touching off. What does your current setup look like?

45
4
75%
Typical reduction: 70–90% RockLock™: <30 sec exchange
Industry Benchmark

5th Axis RockLock™ zero-point systems achieve sub-30 second fixture swaps vs. industry averages of 30–90 minutes with conventional setups. Repeatability to ±0.0002" eliminates re-indicating entirely.

STEP 3 OUT OF 5

Spindle Utilization.

Idle spindles are profit leaks. Multi-part fixtures and faster change-outs drive this number up dramatically.

55%
20%
1
4
Why Utilization Matters

Moving spindle utilization up on a shop's machine fleet is worth tens of thousands per machine annually, before counting labor.

STEP 4 OUT OF 5

Automation Gains.

Lights-out and unattended machining multiply every other efficiency. How far do you want to push it?

0
0%
$
Automation Payback Note

Fixture exchange automation combined with RockLock™ zero-point enables unattended operation that competitors' pallet systems cost 3–5x more to achieve.

STEP 5 OUT OF 5

Quality & Scrap Reduction.

Repeatability and rigidity improvements directly reduce scrap, rework, and inspection time.

4%
50%
$
30
Repeatability Advantage

5th Axis RockLock™ achieves ±0.0002" repeat positioning. Eliminating re-indicating and datum drift is the #1 driver of scrap reduction in multi-setup jobs.